VASA Solar engineering and rooftop installation process in UP
6-Phase Turnkey Roadmap • 100% Transparent Execution

From On-Site Technical Survey to Grid-Connected Power in 10–14 Days

A transparent, engineering-governed roadmap for deploying rooftop solar across Uttar Pradesh. No guesswork, no contractor shortcuts — every phase is delivered with documented milestones, safety compliance, and guaranteed UP DISCOM net-metering.

10–14 Days Complete Turnkey Turnaround
100% DISCOM Net-Metering Handled
3D Laser Shadow Vector Simulation
150 km/h Wind-Rated HDG GI Structures
DAYS 1 – 2 Site Assessment & Shading

Laser measurement & 3D shadow modeling

DAYS 3 – 4 CAD Design & DISCOM Sanction

Electrical SLD & portal application

DAYS 5 – 9 Structure Erection & Panels

HDG steel frames & module mounting

DAYS 10 – 14 Testing, Net-Meter & Subsidy

Meter replacement & grid commissioning

SYSTEMATIC EXECUTION

Our 6-Phase Engineering Architecture

Every VASA solar installation follows a proven, precision-guided workflow to guarantee maximum 25-year energy yield and zero structural risk.

01
DAYS 1 – 2
📏

On-Site Rooftop Survey & 3D Shadow Modeling

Precision physical assessment of your terrace architecture and solar potential.

Our senior solar engineers visit your premises with digital laser rangefinders and solar pathfinders. We analyze parapet wall heights, adjacent building shadow vectors across all 12 months, roof dead-weight structural load capacity, and existing electrical distribution boards.

Phase Deliverables:
  • ✓ 3D Shading Vector Simulation
  • ✓ Shadow-Free Usable Area Map (sq.ft.)
  • ✓ Sanctioned Load vs Generation Sizing
  • ✓ Optimal Earthing Pit & Cable Run Route
02
DAYS 3 – 4
📐

Electrical Architecture & UP DISCOM Filing

Custom CAD blueprint and upfront government net-metering approvals.

We produce custom Single-Line Diagrams (SLD), calculate MPPT string inverter matching voltages, and determine cable gauge sizing to minimize DC transmission loss (<1.5%). Simultaneously, our Lucknow liaison desk files your application on the UP DISCOM portal (MVVNL / PVVNL / DVVNL / PuVVNL) for grid connectivity feasibility.

Phase Deliverables:
  • ✓ CAD Rooftop Layout & String Design
  • ✓ DISCOM Portal Application Registration
  • ✓ Turnkey Proposal with Detailed ROI Timeline
  • ✓ PM Surya Ghar Subsidy Eligibility Token
03
DAYS 4 – 5
📦

Tier-1 Component Procurement & Flash-Testing

Quality verification of modules, inverters, and heavy-gauge steel structures.

We dispatch pre-tested Monocrystalline Bi-Facial modules and high-efficiency inverters from our certified partner ecosystem (Tata, Adani, Waaree, Vikram, Luminous, Microtek). Each module batch is inspected against factory flash-test reports to ensure peak rated wattage output.

Phase Deliverables:
  • ✓ Factory Flash-Test Power Output Reports
  • ✓ 80-Micron Hot-Dip Galvanized GI Steel
  • ✓ UV-Stabilized Double-Insulated Solar DC Cables
  • ✓ IP65 Weatherproof ACDB & DCDB Enclosures
04
DAYS 5 – 9
🏗️

Rooftop Mechanical Fabrication & Panel Mounting

Heavy-duty structural erection with zero roof leakage guarantee.

Our certified structural technicians assemble the elevated HDG framework, anchoring into roof columns or terrace slabs with industrial chemical epoxy fasteners or pre-cast concrete ballast blocks (zero-drilling). Modules are clamped with stainless steel 304 hardware, followed by multi-layer waterproofing inspection.

Phase Deliverables:
  • ✓ Zero Roof Leakage Chemical Epoxy Seals
  • ✓ 150 km/h Wind-Gust Structural Stability
  • ✓ Usable Terrace Height Clearance (Pergola Option)
  • ✓ Stainless Steel SS304 Module Clamps
05
DAYS 10 – 11
⚙️

Electrical Integration & Multi-Point Safety Validation

Earthing, lightning arrestor, inverter sync, and safety protocols.

Our electrical engineers install 3 dedicated copper-bonded chemical earthing pits (Inverter, DC System, Lightning Arrestor) with earthing resistance certified under 2 Ohms. We test Open Circuit Voltages (Voc), short-circuit currents (Isc), insulation resistance, and sync the smart IoT WiFi inverter data gateway.

Phase Deliverables:
  • ✓ 3 Dedicated Chemical Earthing Pits (<2Ω)
  • ✓ Class-II SPD Lightning & Surge Protection
  • ✓ Smart IoT WiFi Mobile Monitoring Activation
  • ✓ Full Insulation & Polarity Safety Audit
⚡
DAYS 12 – 14
✅

UP DISCOM Net-Metering Sync & Subsidy Release

Joint inspection, bi-directional meter testing, and customer handover.

VASA's liaison engineers coordinate the on-site inspection with UP DISCOM sub-divisional officers. The existing energy meter is replaced with a certified bi-directional net-meter. The system is synchronized with the UP grid, and your PM Surya Ghar subsidy claim is submitted for direct bank transfer credit.

Phase Deliverables:
  • ✓ Bi-Directional Net-Meter Installation & Sealing
  • ✓ Official UP DISCOM Commissioning Certificate
  • ✓ PM Surya Ghar National Portal Subsidy Filing
  • ✓ Comprehensive Handover Kit & 25-Year Warranty

OUR ENGINEERING STANDARDS

Why Our Execution Stands the Test of Time

We build solar plants to withstand extreme UP summer heat, monsoon gales, and decades of relentless sun exposure.

🛡️

Zero Roof Leakage Guarantee

We use chemical epoxy anchor seals or pre-cast concrete ballasts. We never drive raw destructive bolts into your terrace waterproofing.

⚡

Triple Chemical Earthing (<2Ω)

Dedicated independent earthing pits for Inverter, Solar Array, and Lightning Protection using copper-bonded rods and Bentonite compound.

🌀

150 km/h Wind Load Rating

Hot-dip galvanized heavy GI steel structure engineered with proper tilt angles (24–27° for UP) to maximize generation and withstand storms.

📱

Real-Time Cloud IoT App

Track your daily units generated, monthly savings, and CO2 offset from anywhere in the world right on your mobile smartphone.

ON-SITE EXECUTION

See Our Solar Craftsmanship in Action

Watch how VASA's certified engineering technicians execute solar installations across Uttar Pradesh with speed, precision, and zero disturbance to your building.

✓ Factory-trained certified installation crew
✓ Strict safety harness & helmet protocols
✓ Neat conduit cable routing with no loose wires
✓ Complete rooftop cleanup upon project completion
Schedule Your Free Site Survey →
▶ Turnkey Rooftop Solar in UP

HASSLE-FREE PREPARATION

What We Need From You

To begin the DISCOM net-metering and PM Surya Ghar subsidy application, you only need to provide 3 basic items:

1

Recent Electricity Bill

A clear copy of your latest UP DISCOM electricity bill showing your 10-digit consumer number and sanctioned load.

2

Aadhaar Card Copy

Required for identity verification on the PM Surya Ghar National Portal and DISCOM consumer KYC update.

3

Bank Passbook / Cheque

Cancelled cheque or first page of bank passbook for direct DBT government subsidy credit into your savings account.

🔒 VASA Enterprises manages 100% of portal registration, portal uploads, junior engineer inspection liaison, and testing paperwork. You don't have to visit any electricity office!
⚡ 100% FREE SITE SURVEY • ZERO OBLIGATION

Ready to Start Your 10-Day Solar Journey?

Book a free technical site survey today. Our senior solar engineer will measure your terrace, calculate optimal system sizing, and prepare your custom UP subsidy proposal.

✓ 3D AutoCAD Roof Shadow Analysis ✓ Direct PM Surya Ghar Subsidy Processing ✓ DISCOM Net-Metering Sanction